| Client
:
Mitsui Ocean Development & Engineering Co. Ltd.
The company successfully executed a major
contract involving manufacture of heavy duty RCC Pipes, which were
intended for the storm water drainage system of Baghdad. Out of the total manufactured
pipes, over 7500 pipes were of diameter 2000mm and above. Some of
these pipes where installed at site by jacking. 8400 pipes were provided
with PVC lining, immediately after spinning as those were carrying
corrosive effluent.
Total Period : 18 Months Total
number of pipes manufactured : 19389 Diameter : 400 to 2500 |