| Important projects currently on execution stage | ||
|
|
Guru Raghavendra Lift Irrigation Scheme, Kurnool District, Andhra Pradesh | |
| CLIENT: Irrigation and CAD Department, GRP Circle, Yemmiganoor, Andhra Pradesh | ||
| PACKAGE-97: Investigation, Design, Estimation and execution of 3 Nos. of Lift Irrigation Schemes for supply water to 13,700 Acres by lifting water all along Tunghabhadra River under Guru Raghavendra Project namely 1) Duddi (Single Stage) 2) Madhavaram (Two Stage) 3) Basala doddi (Two Stage) near Mantralayam, Kurnool District. This project includes construction of Pump Houses, Approach Channel, Cisterns, Storage Tanks, Supply/Gravity Channel /Pumping Machinery etc. | ||
| Total value of the work: Rs. 599.92 Million | ||
|
|
Kanakpur Lift Irrigation Scheme, Adilabad District, Andhra Pradhesh | |
| CLIENT : Andhra Pradesh State Irrigation Development Corporation, Nirmal | ||
|
Construction and commissioning on turnkey basis of KANAKAPUR Lift Irrigation Scheme on foreshore of SRSP in Lokeswaram Mandal of Adilabad District including maintenance of the scheme for two years. Includes pipeline of 10.60 Kms Prestressed Concrete Pipes of 1400MM, 1300MM, 1100MM, 1000MM, 800MM, 600MM, 400MM & 350MM Dia., Reinforced Cement Concrete Pipelines, Civil Structures, Electro Mechanical Works, etc. |
||
| Total value of the work: Rs.163.49 Million | ||
|
|
Water Supply Improvement Scheme, Nizamabad, Andhra Pradesh | |
| CLIENT: Public Health Circle, West Circle, AC Guards, Hyderabad. Andhra Pradesh | ||
| Nizamabad Water Supply Improvement Scheme – Laying of 900 mm Ø Bar Wrapped Steel Cylinder Pipe line from Alisagar Filtration plant to Elevated Service Reservoir, Autonagar with Alisagar as source | ||
| Total value of the work: Rs. 155.14 Million. | ||
|
|
Soganuru Lift Irrigation MI Scheme, Kurnool District, Andhra Pradesh | |
| CLIENT: Irrigation and CAD Department, Yemmiganur, Andhra Pradesh | ||
|
Construction and commissioning
on turnkey basis including one year maintenance of Soganuru lift Irrigation
M.I scheme on right bank of Tungabhadra river with 2 stage near Chinnakohi(V)
, Vemmlganur(M), Kurnool district with 800 to 1300 MM Diameter Prestressed Concrete
Pipelines.
|
||
|
|
Godavari Lift Irrigation Scheme, Warangal District, Andhra Pradesh | |
| CLIENT: M/s Hindustan Construction Company Ltd., Mumbai |
![]() |
|
| Supply of MS Pipe with a Dia of 3000MM for Godavari Lift Irrigation Scheme. Stage-II in Warangal District. | ||
| Total value of the work: Rs.142.2 Million | ||
|
|
Pulachintha Lift Irrigation, Kurnool District, Andhra Pradesh | |
| CLIENT: Irrigation and CAD Department, Yemmiganur, Andhra Pradesh | ||
|
Construction and commissioning on turnkey basis including one year maintenance of Pulachintha lift Irrigation M.I scheme on right bank of Tungabhadra river with 2 stage near Pulachintha (V), Nandvaram(M), Kurnool district with1300 MM Diameter Prestressed Concrete Pipeline |
||
| Total value of the project : Rs. 122.2 million | ||
|
|
Sandegaon Lift Irrigation Scheme, Adilabad District, Andhra Pradhesh | |
| CLIENT : Andhra Pradesh State Irrigation Development Corporation, Nirmal | ||
| Construction and commissioning on turnkey basis of SANDEGAON Lift Irrigation Scheme on Wardha River in Kowthala Mandal of Adilabad District and maintenance of the scheme for two years. ncludes Prestressed Concrete Pipeline of 4.83 Kms with 1400MM & 900MM, Reinforced Cement Concrete Pipelines, Civil Structures, Electro Mechanical Works, etc | ||
| Total value of the work: Rs.101.82 Million | ||
|
|
Surli, Asta and Panchagudi Lift Irrigation Scheme, Adilabad District, Andhra Pradhesh | |
| CLIENT : Andhra Pradesh State Irrigation Development Corporation, Nirmal | ||
|
Construction and Commissioning on turnkey basis of Surli, Asta and Panchagudi Lift Irrigation Scheme on Foreshore of S.R.S.P in Mudhole and Lokeswaram Mandals of Adilabad District including maintenance of the schemes for one year. This project includes Pipeline of 7.19 Kms with Prestressed Concrete Pipes of 700MM, 800MM & 900MM, Reinforced Cement Concrete Pipelines, Civil Structures, Electro Mechanical Works, etc |
||
| Total value of the work: Rs.92.96 Million | ||
|
|
Ananthavaram Lift Irrigation Scheme, Guntur District, Andhra Pradesh | |
| CLIENT : Andhra Pradesh State Iirrigation Development Corporation, Guntur Division | ||
| Construction and commissioning on turnkey basis of Ananthavaram Lift Irrigation Scheme on Pedamadduru Vagu in Tullur Mandal of Guntur District and maintenance of the scheme for one year, with Prestressed Concrete Pipeline of 4.83Kms with 720MM, 1000MM & 1200MM Dia. pipes and also RCC and Electro Mechanical Works. | ||
| Total value of the work: Rs. 93.81 Million | ||
|
|
Water Supply Scheme to Nalgonda, Andhra Pradesh | |
| CLIENT: Panchayath Raj Department Rural Water Supply Circle, Nalgonda, Andhra Pradesh | ||
|
Combined water supply scheme to Narkatpally, Chityal Ramannapet and 96 other habitations for Nalgonda Rural Drinking water supply Phase-III Package -II with 600/700 Diameter Bar Wrapped Steel Cylinder Pipeline |
![]() |
|
| Total Value of the project : Rs. 88.8 million | ||
|
|
Combined Project of Water Supply to Shankarpally in Ranga Reddy District, Andhra Pradesh | |
| CLIENT : RWS Circle, Panjayatraj Department, Hyderabad | ||
| Combined Project of Water Supply Scheme to Shankarpally and other habitations in Shankarapally and Gandhamguda Package and to Gandhamguda and 8 other habitations in polluted affected areas in Ranga Reddy District. The project consists of Bar Wrapped Steel Cylinder Pipes of 350MM, 400MM, 450MM Dia, PVC,DI, HDPE Pipeline and Civil Structures. | ||
| Total value of the work: Rs. 72.86 Million | ||
|
|
Sewerage Scheme for Hyderabad, Andhra Pradesh | |
| CLIENT: Hyderabad Metro Water Supply and Sewerage Board, Hyderabad, Andhra Pradesh | ||
|
PACKAGE-4: Manufacturing, supplying, laying, jointing, testing and commissioning of Uppal Sewer Main 1400 mm Ø Reinforced Concrete Cement Pipe (NP4 Class) with Sulphate Resistant Cement from St. Gabriel Education Center, Kalyanpuri to Nallacheruvu, Uppal. |
||
|
Total value of the work: Rs. 49.41 Million. |
||
|
|
Gondal Water Supply Scheme, Rajkot District, Gujarat | |
| CLIENT: Gondal Nagarpalika, Gondal, Dist. Rajkot. | ||
|
Augmentation to Gondal Water Supply Scheme based on Veri Dam, Rajkot District, Gujarat for Providing, lowering, laying & jointing 700MM Dia. Bar Wrapped Steel Cylinder Pipes 4.77 Kms. |
||
| Total value: Rs. 21.95 Million | ||
|
|
Sea Water Intake & Effluent Pipeline, Junagarh, Gujarat | |
| CLIENT: M/s. Gujarat Heavy Chemicals Limited (GHCL), Sutrapada, Dist. Junagarh, Gujarat | ||
|
Supply of 1800MM Dia Prestressed Concrete Pipe line for 720 meters for Seawater Intake and Effluent Pipeline into seabed |
||
|
Total Value of the work: Rs. 12.19 Million |
||
|
|
CWS Scheme to Humnabad - Chitaguppa Towns & Enroute Villages in Bidar District, Karnataka | |
| CLIENT: Karnataka Urban Water Supply & Drainage Board, Dharwad, Karnataka | ||
|
Combined Water Supply Scheme to Humnabad - Chitaguppa Towns & Enroute villages in Bidar Dist.by Providing and Laying of 500MM Dia. & 375MM Dia Prestressed Concrete Pipes, 350MM Dia. K-9 DI Pipeline, Construction of RCC Circular Sump with a capacity of 10,00,000 Liters, Pump House, BP Tank with a capacity of 2,50,000 Liters, Over Head Tanks with a capacity of 5,00,000 Liters and allied works. |
||
| Total Value of the work: Rs. 50.76 Million. | ||
|
|
Varahi Hydro Electrical Project - Phase II | |
| CLIENT : Chief Engineer (Civil), Sharavati, Karnataka Power Corporation. Ltd., Karnataka | ||
| Fabrication and erection of 3000 mm and 4000 mm dia. Penstock Pipes alongwith civil work, total tonnage 1955 M.T. | ||
| Total value of the work: Rs. 326.00 Million | ||
|
|
K & A and V Valley, Bangalore, Karnataka | |
| CLIENT: Bangalore Water Supply and Sewerage Board, Bangalore, Karnataka | ||
| Laying of new trunk sewers with 450 to1600 Diameter Reinforced Cement Concrete Pipes under NRCP funding, K & A and V Valley. |
![]() |
|
| Total value of the project : Rs. 220.3 million | ||
|
|
Water Supply Scheme, Kochi, Kerala | |
| CLIENT: Kerala Water Authority, Kochi, Kerala | ||
|
Replacing 700 MM Premo pumping main by supplying and laying of Bar Wrapped Steel Cylinder Pipe 700MM Dia. from Naval Base, Travancore Gate to Bristow Road. |
||
|
Total value of the project; Rs. 18.05 Million. |
||
|
|
Nimgaon Gangarde and other 17 Villages Regional Rural Water Supply Scheme, Maharashtra | |
| CLIENT: Maharashtra Jeevan Pradhikaran, Maharashtra | ||
| Turnkey project involving design, installation, commissioning of entire project of carrying raw water from their identified source, after treating , distributing it through pipelines , sumps, pumping systems, service reservoirs of different habitations of various sizes in and around Nimgaon Gangarde and other 17 villages of Karjat Taluka, Ahmednagar, Maharashtra State. The major components involved are the following: | ||
| Construction of Coffer Dam, Intake Well, Inspection Chambers, Approach Bridge, Water Treatment Plant, Staff Quarters and fencing | ||
| Providing and installing Raw Water Pumping Machinery at a discharge of 1,88,300 LPH | ||
| Providing, laying, commissioning the Distribution System with PVC pipeline 63MM to 200MM Diameter and a pressure 4 kg/cm2 to 6 kg/cm2 for a length of 79.8 Km. | ||
| Supply, laying, jointing, testing and commissioning of 300MM Diameter x 16 kg/cm2 for a length of about 1.6 Km Bar Wrapped Steel Cylinder Pipeline of raw water rising main from Jack well to Aeration Fountain | ||
| Supply, laying, jointing, testing and commissioning of 350MM Diameter x 6 to 12 Kg/cm2 Prestressed Concrete (non-Cylinder) Pipeline- 26 Kilo meters for Pure Water Gravity Main with 42 Km of PVC and C. I. L. A class pipes. | ||
| Total value of the project : Rs. 107 million | ||
|
|
Augmentation to Malegaon Water Supply Scheme, Nasik District, Maharashtra | |
| CLIENT: Maharashtra Jeevan Pradhikaran, Malegaon. | ||
|
The work includes Providing, lowering, laying & jointing Bar Wrapped Steel Cylinder Pipes of 800mm Dia. and 900MM & 1000MM Dia. Prestressed Concrete Cylinder Pipes for a stretch of 5.17 Kms for Pure Water Leading Main and Rising Main from New and Existing Working Test Pressure to New and Existing ESRs in Malegaon, Nasik City as an .Augmentation to Malegaon Water Supply Scheme (Girna Dam as a source), Malegaon, Nasik District (Group-III C). |
||
|
Total value of the work; Rs. 55.94 Million. |
||
|
|
Saiganga Lift Irrigation Scheme, Ahmednagar District, Maharashtra | |
| CLIENT: Minor Irrigation (L.S.) Division, Ahmednagar | ||
| Construction of Saiganga Lift Irrigation Scheme No. III, Tal. Rahata, Dist. Ahmednagar. | ||
| Total value of the work: Rs. 26.60 Million | ||
|
|
Supply of Broad Gauge Mono-block Sleepers to Indian Railways | |
| CLIENT : Executive Director (Track), Railway Board, New Delhi | ||
| Manufacture and supply of 3,00,000 numbers of Mono-block Prestressed Concrete Sleepers (pre-tensioned type) for Broad Gauge Railway Line to Indian Railways. | ||
| Total value of the work: Rs. 259.50 Million. | ||
|
|
Water Supply Project for Bisalpur Transmission Main II, Rajasthan. | |
| CLIENT : M/s I.V.R.C.Ltd. Jaipur. | ||
| Providing and laying pipeline with Prestressed Concrete Pipes of 900 MM Dia for a stretch of 18.94 Kms and 800 MM Dia. for 54.85 Kms. | ||
| Total value of the work: Rs. 217.00 Million. | ||
|
|
Pattanam Seerapalli Combined Water Supply Scheme, Namakkal, Tamil Nadu | |
| CLIENT: Tamil Nadu Water supply and Drainage Board, Western Region, Coimbatore, Tamil Nadu | ||
| Clear Water Supply Scheme to 4 Panchayats & 1081 Rural Habitations in Namakkal District - Phase II, a turnkey project involving design, installation, commissioning of entire project of carrying raw water from their identified source after treating distributing it through pipelines. | ||
|
HEAD WORKS - Construction of Coffer Dam, Off take Well, Silt Removing Chambers, Collection Well 12 mtr dia cum Pump House 15 meter Dia, Approach Road & LT Room. |
||
| TREATMENT PLANT - 30 MLD Water Treatment Plant, Staff Quarters, 4 Lac Capacity Wash Water Tank, 25 Lac Capacity Clear Water Reservoir – 2 Nos. Staff Quarter & Compound Walls. | ||
| STRUCTURES – Construction of Sumps – 61 Nos., Pump Rooms – 58 Nos., Service Reservoirs - 81 Nos. & Compound Wall – 33 Numbers | ||
| Providing and installing Raw Water pumping Machinery at a Discharge of 5442 LPM – 6 Nos. & Booster & Feeder Mains on Various places – 7023 LPM to 76 LPM. | ||
| Supply, Laying, jointing, Testing & Commissioning of 800 & 700mm MS Pipes (22 Ksc to 18 Ksc) – 2.56 Km. | ||
| Supply, Laying, jointing, Testing & Commissioning of 800, 700, 600 & 350mm Prestressed Concrete Pipes (16 Ksc to 06 Ksc) – 87.36 Km. | ||
| Supply, Laying, jointing, Testing & Commissioning of 250, 200 & 150 AC Pipes (20 & 15 Class) – 123.29 Km. | ||
| Supply, Laying, jointing, Testing & Commissioning of 140 to 50mm PVC Pipes (10 Ksc to 04 Ksc) – 1258.77 Km. | ||
| Total value of the project : Rs. 672.30 Million. | ||
|
|
Water Supply Scheme to Nagapattinam Municipality, Tamil Nadu | |
|
CLIENT: Tamil Nadu Water supply and Drainage Board, Eastern Region, Thanjavur, Tamil Nadu |
![]() |
|
|
Combined water supply scheme to Nagapattinam Municipality Kilvelur and Velankanni RTPS with bulk provision for 890 rural habitations in Nagapattinam, Keezhaiyur,Thirumarugal, Thalainayar and Kilvelur Panchayat Union in Nagapattinam District PSC/ AC/ PVC pipelines of various Diameter and Electrical, Mechanical and other component on turnkey basis. This project is in final stage of completion and commissioning. |
||
| Total value of the project : Rs. 591.0 million | ||
|
|
Water Supply Scheme to Kayathar UTP, Tamil Nadu | |
| CLIENT: Tamil Nadu Water supply and Drainage Board, Southern Region, Madurai-7, Tamil Nadu | ||
|
Providing
combined water supply scheme to Kayathar UTP, Kalugumalal UTP, Ettayapuram
UTP in Thoothukudi District and Sattur Municipality in Virudhunagar District
including maintenance of scheme with PSC/AC/PVC pipelines of various Diameter
and Electrical, Mechanical and other component on turnkey basis.
This project is in final stage of
completion and commissioning. |
||
|
|
Combined Water Supply to Villukuri, Kanyakumari District, Tamil Nadu | |
| CLIENT: Tamil Nadu Water Supply and Drainage Board, Southern Region, Madurai. | ||
|
Providing Combined Water Supply Scheme to Villukuri, Aloor special village Panchayats and 53 rural habitations in Kurunthancode, Thuckalay Union in Kanyakumari District. |
||
| Total value of the project Rs. 79.51 Million. | ||
|
|
Water Supply Scheme to Export Oriented Industries ( ASIDE) in and around Thoothukudi District | |
| CLIENT: Tamil Nadu Water Supply and Drainage Board, Southern Region, Madurai, Tamil Nadu | ||
| Total value of the project Rs. 76.65 Millions | ||
|
|
Water Supply Irrigation Scheme for Cumbum Union, Tamil Nadu | |
| CLIENT: Tamil Nadu Water Supply and Drainage Board, Southern Region, Madurai, Tamil Nadu | ||
|
This scheme is C.P. Pudupatti, Kamayagoundapatti, Hanumanthapatti and Uthamapalayam SVPs and Narayanathevanpatti and 4 villages Panchayats of Cum bum Union with bulk provision to Kombai, Pannaipuram and Thevaram SVPs |
||
| Total value of the project Rs. 73.12 Million | ||
|
|
Water Supply Improvement Scheme to Thatchanallur in Tirunelveli, Tamil Nadu | |
| CLIENT: Tamil Nadu Water Supply and Drainage Board, Southern Region, Madurai. | ||
|
Providing Water Supply Improvement Scheme to Thatchanallur area ward 1 to 4 and 55 (part) and ward 8 to 10 in Tirunelveli City Municipal Corporation. |
||
| Total value of the project Rs. 44.20 Million. | ||
|
|
Water Supply Scheme for Arni in Thiruvannamalai District, Tamil Nadu | |
|
CLIENT: Tamil Nadu Water Supply and Drainage Board, Northern Region, Vellore. |
||
|
Laying of alternate Pumping main of 11.35 Kms for Arni Municipality Water Supply Irrigation Scheme in Thiruvannamalai District. |
||
|
Total value of the project: Rs. 15.60 Million |
||
| Home | Top |
|